Paint shopPony Luxury Coating
Pony L11000 (11x5x5)
Paint shop
Pony Luxury Coating
Pony L11000 (11x5x5)
Year of construction
2025
Condition
New
Location
Würzburg 

Show images
Show map
Machine data
- Machine type:
- Paint shop
- Manufacturer:
- Pony Luxury Coating
- Model:
- Pony L11000 (11x5x5)
- Year of construction:
- 2025
- Condition:
- new
- Functionality:
- fully functional
Price & Location
- Location:
- Schulstr 3, 97084 Würzburg, Deutschland

Call
Technical details
- Total height:
- 5,600 mm
- Total length:
- 11,200 mm
- Total width:
- 5,100 mm
- Type of input current:
- three-phase
- Warranty duration:
- 24 months
- Inner dimension height:
- 4,970 mm
- Inner dimension length:
- 11,000 mm
- Temperature:
- 80 °C
- Inner dimension width:
- 5,000 mm
- Air demand:
- 52,000 m³/h
- Input voltage:
- 380 V
- Heating capacity:
- 250 kW (339.91 HP)
- Power:
- 45 kW (61.18 HP)
- Fuel:
- liquid petroleum gas (LPG)
- Input frequency:
- 50 Hz
- Energy consumption:
- 45 kWh
- Insulation thickness:
- 50 mm
- Nominal power:
- 250 kW (339.91 HP)
- Sheet thickness steel (max.):
- 2 mm
- Equipment:
- lighting
Details about the offer
- Listing ID:
- A19572531
- Update:
- 07.10.2025
Description
* Air Preparation Unit:
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
Lsdpfxswzl Hxj Ag Rehp
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
The listing was translated automatically. Translation errors are possible.
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
Lsdpfxswzl Hxj Ag Rehp
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
The listing was translated automatically. Translation errors are possible.
Documents
Seller
Note: Register for free or log in, to access all information.
Registered since: 2025
Send inquiry
Telephone & Fax
+49 176 7... show
These listings may also fit your interest.
Listing
Velen
18,508 km
Tools
HBMKrimpzange Akku
HBMKrimpzange Akku
Listing
Großenlüder
18,474 km
Sandblasting system, blasting hall
Oliver Fritz GmbH & Co. KGStrahlhaus Easy 10mx5mx5m LxBxH
Oliver Fritz GmbH & Co. KGStrahlhaus Easy 10mx5mx5m LxBxH
Listing
Wielka Nieszawka
17,812 km
GANTRY CRANE 5 T - NEW
WNM Sp. Z O.O.
WNM Sp. Z O.O.
Listing
Büyükkayacık OSB
16,804 km
Lowbed semitrailer for transportation of construction machinery
GVN Trailer3 Axle Hydraulic Platform Lowbed
GVN Trailer3 Axle Hydraulic Platform Lowbed
Listing
Parma
18,706 km
Lowbed construction machinery
CEYLAN carrellone rampe idrauliche nuovo
CEYLAN carrellone rampe idrauliche nuovo
Listing
Nettetal
18,590 km
Powder oven
KM IndustrieserviceElektro Kammerofen KM Pro
KM IndustrieserviceElektro Kammerofen KM Pro
Listing
Malax
17,020 km
Giardini GST UV drying tunnel
GiardinaGST 1401/3+2
GiardinaGST 1401/3+2
Listing
Büyükkayacık OSB
16,804 km
Low loader semitrailer
GVN Trailer3 Axle Tramex Platform Lowbed
GVN Trailer3 Axle Tramex Platform Lowbed
Listing
Toruń
17,804 km
Spray booth 12x5x5m with Floor Base
ABC-Group
ABC-Group
Listing
Petershagen
18,376 km
Low loader semitrailer
Gabelstapler/Arbeitsbühnentransporter Klapprampe
Gabelstapler/Arbeitsbühnentransporter Klapprampe
Your listing has been deleted successfully
An error has occurred


























































































