Clean ROOM ISO 8
Clean ROOM ISO 8
EXW ONO plus VAT
€50,000
Year of construction
2020
Condition
Used
(fully functional)
Location
Łódź 

Basic data
- Machine type:
- Clean ROOM ISO 8
- Year of construction:
- 2020
- Condition:
- excellent (used)
- Functionality:
- fully functional
Price & Location
EXW ONO plus VAT
€50,000
- Location:
- Łódź, Poland

Call
Details about the offer
- Listing ID:
- A14477200
- Update:
- 02.01.2024
Description
CLEANROOM - ISO 8
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Iedoq H H Ruepfx Ahyeih
Technical data attached to the photos.
The listing was translated automatically. Translation errors are possible.
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Iedoq H H Ruepfx Ahyeih
Technical data attached to the photos.
The listing was translated automatically. Translation errors are possible.
Seller
Note: Register for free or log in, to access all information.
Registered since: 2023
1 listing online
Send inquiry
Telephone & Fax
+48 728 4... show
These listings may also fit your interest.
Success:
Your message has been sent.
Auction
Ends in
d
h
min
s
Auction ended
Veneto
18,519 km
Vertical machining center
HWACHEONSIRIUS U
HWACHEONSIRIUS U
Success:
Your message has been sent.
Listing
Hamburg
18,232 km
Storage elevator
ModulaLift ML 50D
ModulaLift ML 50D
Success:
Your message has been sent.
Auction
Ends in
d
h
min
s
Auction ended
Veneto
18,519 km
Vertical machining center
HEDELIUSCB 70
HEDELIUSCB 70
Success:
Your message has been sent.
Auction
Ends in
d
h
min
s
Auction ended
Nordrhein-Westfalen
18,510 km
Vertical machining center
FAMUP - EmcoMCP 100 Evolution
FAMUP - EmcoMCP 100 Evolution
Success:
Your message has been sent.
Listing
Aumühle
18,322 km
Steel construction platform 1200m²
Success:
Your message has been sent.
Auction
Ends in
d
h
min
s
Auction ended
Ruše
18,270 km
Laser cutting machine
MICROSTEP/VirsMSF 3001.15L
MICROSTEP/VirsMSF 3001.15L
Success:
Your message has been sent.
Auction
Ends in
d
h
min
s
Auction ended
Mecklenburg-Vorpommern
18,068 km
CNC lathe
INDEXC 65
INDEXC 65
Success:
Your message has been sent.
Listing
Wuppertal
18,549 km
Spotting Press
HESSMERT160 EST
HESSMERT160 EST
Success:
Your message has been sent.
Auction
Ends in
d
h
min
s
Auction ended
Netherlands
18,558 km
High level order picker
JungheinreichEJC 112
JungheinreichEJC 112
Success:
Your message has been sent.
Auction
Ends in
d
h
min
s
Auction ended
Germany
18,500 km
Laser cutting machine
TRUMPFTruLaser 5040 Fiber
TRUMPFTruLaser 5040 Fiber
Success:
Your message has been sent.
Listing
Weert
18,620 km
Overhauled industrial robot + warranty
KUKAKR210 R3100 ultra KRC4
KUKAKR210 R3100 ultra KRC4
Success:
Your message has been sent.
Auction
Ends in
d
h
min
s
Auction ended
Berlin
18,131 km
Laser punching machine
TRUMPF TC 7000-1300TC 7000-1300
TRUMPF TC 7000-1300TC 7000-1300
Success:
Your message has been sent.
Auction
Ends in
d
h
min
s
Auction ended
Netherlands
18,558 km
Double miter saw
OmgaV 235
OmgaV 235
Success:
Your message has been sent.
Listing
Güglingen
18,606 km
Ventilation unit, air handler, hall cooling
IKGIKL150
IKGIKL150
Success:
Your message has been sent.
Auction
Ends in
d
h
min
s
Auction ended
Netherlands
18,558 km
Panel saw
HolzmaHPL 400/43/16
HolzmaHPL 400/43/16
Your listing has been deleted successfully
An error has occurred





















































































































































































































