HeatingGilles
HPKI-K 300
Heating
Gilles
HPKI-K 300
Year of construction
2013
Condition
Used
(fully functional)
Location
Amstetten 

Machine data
- Machine type:
- Heating
- Manufacturer:
- Gilles
- Model:
- HPKI-K 300
- Year of construction:
- 2013
- Condition:
- used
- Functionality:
- fully functional
Price & Location
- Location:
- Amstetten, Austria

Call
Technical details
- Overall weight:
- 4,000 kg
- Smoke pipe connection diameter:
- 200 mm
- Nominal heat output:
- 300 kW (407.89 HP)
- Space requirement length:
- 4,040 mm
- Space requirement height:
- 2,250 mm
- Space requirement width:
- 5,150 mm
- Temperature:
- 95 °C
- Total height:
- 2,250 mm
- Total length:
- 3,450 mm
- Total width:
- 1,250 mm
- Operating pressure:
- 5 bar
- Equipment:
- documentation/manual
Details about the offer
- Listing ID:
- A22618572
- Update:
- 26.08.2026
Description
Gilles HPKI-K 300 – 300 kW industrial wood chip boiler – 2013
For sale is a Gilles HPKI-K 300 industrial wood chip-fired biomass boiler, with 300 kW nominal output, with a 2013 year of manufacture.
A particularly important advantage of the equipment is the 2013 model year, which is considered exceptionally young in this capacity category and among industrial biomass boilers.
Technical data:
Manufacturer: Gilles
Type: HPKI-K 300
Year of manufacture: 2013
Ndjdpfx Ahszwkrpokea
Nominal output: 300 kW
Water volume: 1 100 liters
Maximum operating temperature: 95 °C
Maximum operating pressure: 5 bar
Electrical connection: 400 V / 50 Hz
Maximum current consumption: 28 A
Maximum electrical power: 18 kW
Fuel: wood chips
Wood chip size class: G50 / G100
Moisture content: W40
The Gilles is currently part of the Hargassner group, so the service background, technical support and spare parts supply remain ensured for Gilles biomass boilers.
The boiler will be dismantled on Monday, August 31, 2026, and Tuesday, September 1 at its current installation site.
This is a particularly good opportunity for the buyer because the equipment can be loaded and transported directly from the dismantling site to the buyer, so it is not necessary to transport it to our warehouse in Hungary first.
Direct onsite removal allows for significantly more favorable conditions, as in this case, additional costs for transport to the Hungarian warehouse, repeated loading, handling, and storage do not arise.
The equipment includes:
Gilles HPKI-K 300, 300 kW boiler
2 red transport augers
Complete control cabinet / control system
Motorized stoker auger / feeding unit, which feeds the wood chips directly into the boiler
The related accessories visible in the photos
If the equipment must first be transported to our warehouse in Hungary and stored there, the sale conditions will change accordingly, as the extra transport, loading, handling, and storage costs can mean thousands of euros in additional expenses.
Optional complete wood chip extraction system
Upon request, a complete, original Fröling spring-arm wood chip extraction system is also available separately from our warehouse, which includes:
Spring-arm extraction system
Transport auger
Electric motor
Gearbox
The complete Fröling extraction system can also be purchased together with the Gilles boiler.
Current pricing and exact conditions will be provided upon inquiry.
In case of direct onsite removal, the schedule must be coordinated prior to dismantling.
For sale is a Gilles HPKI-K 300 industrial wood chip-fired biomass boiler, with 300 kW nominal output, with a 2013 year of manufacture.
A particularly important advantage of the equipment is the 2013 model year, which is considered exceptionally young in this capacity category and among industrial biomass boilers.
Technical data:
Manufacturer: Gilles
Type: HPKI-K 300
Year of manufacture: 2013
Ndjdpfx Ahszwkrpokea
Nominal output: 300 kW
Water volume: 1 100 liters
Maximum operating temperature: 95 °C
Maximum operating pressure: 5 bar
Electrical connection: 400 V / 50 Hz
Maximum current consumption: 28 A
Maximum electrical power: 18 kW
Fuel: wood chips
Wood chip size class: G50 / G100
Moisture content: W40
The Gilles is currently part of the Hargassner group, so the service background, technical support and spare parts supply remain ensured for Gilles biomass boilers.
The boiler will be dismantled on Monday, August 31, 2026, and Tuesday, September 1 at its current installation site.
This is a particularly good opportunity for the buyer because the equipment can be loaded and transported directly from the dismantling site to the buyer, so it is not necessary to transport it to our warehouse in Hungary first.
Direct onsite removal allows for significantly more favorable conditions, as in this case, additional costs for transport to the Hungarian warehouse, repeated loading, handling, and storage do not arise.
The equipment includes:
Gilles HPKI-K 300, 300 kW boiler
2 red transport augers
Complete control cabinet / control system
Motorized stoker auger / feeding unit, which feeds the wood chips directly into the boiler
The related accessories visible in the photos
If the equipment must first be transported to our warehouse in Hungary and stored there, the sale conditions will change accordingly, as the extra transport, loading, handling, and storage costs can mean thousands of euros in additional expenses.
Optional complete wood chip extraction system
Upon request, a complete, original Fröling spring-arm wood chip extraction system is also available separately from our warehouse, which includes:
Spring-arm extraction system
Transport auger
Electric motor
Gearbox
The complete Fröling extraction system can also be purchased together with the Gilles boiler.
Current pricing and exact conditions will be provided upon inquiry.
In case of direct onsite removal, the schedule must be coordinated prior to dismantling.
Seller
Note: Register for free or log in, to access all information.
Registered since: 2021
10 listings online
Send inquiry
Telephone & Fax
+36 30 66... show
Your listing has been deleted successfully
An error has occurred






























