Insulating glass production machinelisec
Inspection Lightwall
Insulating glass production machine
lisec
Inspection Lightwall
Year of construction
2021
Condition
Used
Location
Maasmechelen 

Show images
Show map
Machine data
- Machine type:
- Insulating glass production machine
- Manufacturer:
- lisec
- Model:
- Inspection Lightwall
- Year of construction:
- 2021
- Condition:
- excellent (used)
Price & Location
- Location:
- Breitwaterstraat 22, 3630 Maasmechelen, BE
Call
Machine sale

Found a new machine? Now turn the old one into cash.
Achieve the best price through Machineseeker.
More about selling machinery
More about selling machinery
Details about the offer
- Listing ID:
- A18625526
- Update:
- 01.03.2025
Description
1. Switch on the wall and the electronics.
Do this by switching on the mean switch and the lightwall (on the back). So switch on the multimeters. See photos 1 and 2
2. Adjust the upper and lower beam to the right cell height. Do this with 2 people. See photo 3
3. Check if there is no power on the cables coming from the power beam. Use the multimeters for this.
4. Connect the cells with the cables.
5. Check the cells with the protocol “Q3 quality finished cell”.
Fpedev Ep U Aspfx Afien
6. Use the right voltages for the different products. 24V for ddLC and 46V for scatter.
7. When doing the capacity measurement, turn the black switching knob from “power” to “R/C”. When done turn it back to “power”
8. When you have ddLC cells use the lightwall and the rotatable polar.
9. If you have scatter cells remove the lightwall and use the spotlight. For swtiching on/of this spotlight you can use the remote control. See photo 4.
10. When you are done, please use the mainswitch to power down, and switch of the used lights.
The listing was translated automatically. Translation errors are possible.
Do this by switching on the mean switch and the lightwall (on the back). So switch on the multimeters. See photos 1 and 2
2. Adjust the upper and lower beam to the right cell height. Do this with 2 people. See photo 3
3. Check if there is no power on the cables coming from the power beam. Use the multimeters for this.
4. Connect the cells with the cables.
5. Check the cells with the protocol “Q3 quality finished cell”.
Fpedev Ep U Aspfx Afien
6. Use the right voltages for the different products. 24V for ddLC and 46V for scatter.
7. When doing the capacity measurement, turn the black switching knob from “power” to “R/C”. When done turn it back to “power”
8. When you have ddLC cells use the lightwall and the rotatable polar.
9. If you have scatter cells remove the lightwall and use the spotlight. For swtiching on/of this spotlight you can use the remote control. See photo 4.
10. When you are done, please use the mainswitch to power down, and switch of the used lights.
The listing was translated automatically. Translation errors are possible.
Seller
Note: Register for free or log in, to access all information.
Registered since: 2019
Send inquiry
Telephone & Fax
+32 89 53... show
Your listing has been deleted successfully
An error has occurred