Steam turbine1. Brněnská strojírna
Turbogenerator set 25MW
Steam turbine
1. Brněnská strojírna
Turbogenerator set 25MW
EXW ONO plus VAT
€280,000
Year of construction
1985
Condition
Used
Location
Czech Republic 

Show images
Show map
Machine data
- Machine type:
- Steam turbine
- Manufacturer:
- 1. Brněnská strojírna
- Model:
- Turbogenerator set 25MW
- Year of construction:
- 1985
- Condition:
- used
- Functionality:
- fully functional
Price & Location
EXW ONO plus VAT
€280,000
- Location:
- 117, Vratimovská 689, 719 00 Slezská Ostrava, Czechia
Call
Technical details
- Pressure:
- 90 bar
- Power:
- 25,000 kW (33,990.50 HP)
- Frequency:
- 50 Hz
- Temperature:
- 515 °C
- Overall weight:
- 34,000 kg
- Rotational speed (max.):
- 3,000 rpm
Details about the offer
- Listing ID:
- A19313411
- Reference number:
- TG2
- Update:
- 06.06.2025
Description
1. Brněnská strojírna, Turbogenerator set, back pressure steam turbine 25MW
Manufacturer: 1. Brněnská strojírna
Power: 25 000 kW
Type: R25-9/1,9
RPM: 3000 / min
Steam pressure: 90 bar
Output steam pressure: 18 bar
Steam temperature: 515 ºC
The equipment is from year 1985 and has received all maintenance required for the maximum reliability, availability and capacity.
Size: 3 000 x 3 000 x 5 100 mm
Weight: 34 000 kg
Generator, gearbox, oil system and all related electro and InC equipment included.
We will send all technical data on request.
Dcedpfx Aswqp Edsf Ion
Maintenece:
The TG2 has been regularly maintained and serviced since its commissioning. GO and SO have been carried out at intervals of about 5 years according to the actual condition. The O&M was carried out by the turbine manufacturer or a specialist company in the field.
The last O&M was carried out in 2010-2011 for a total amount of 47.3 million EUR. The following repairs were carried out:
- repair of the rotor with new blading
- repair of the stator flow section with new blading
- Replacement of quick-stop and control valve blocks
- repair of the control
- oil revision. system, repair of pumps
- revision of steam system, valves, drainage, replacement of steam hinges
The last repair (SO) was carried out in 2022-2023 for a total amount of 22 mil. The following repairs were carried out:
- inspection of the flow section of the turbine, cleaning, replacement of seals, balancing of the rotor
- oil revision and cleaning. system, revision of oil pumps, new radiator tubes
- revision and repair of the turbine control and the control safety system
- inspection of steam pipes and valves
Regular maintenance and servicing was carried out during operation.
Manufacturer: 1. Brněnská strojírna
Power: 25 000 kW
Type: R25-9/1,9
RPM: 3000 / min
Steam pressure: 90 bar
Output steam pressure: 18 bar
Steam temperature: 515 ºC
The equipment is from year 1985 and has received all maintenance required for the maximum reliability, availability and capacity.
Size: 3 000 x 3 000 x 5 100 mm
Weight: 34 000 kg
Generator, gearbox, oil system and all related electro and InC equipment included.
We will send all technical data on request.
Dcedpfx Aswqp Edsf Ion
Maintenece:
The TG2 has been regularly maintained and serviced since its commissioning. GO and SO have been carried out at intervals of about 5 years according to the actual condition. The O&M was carried out by the turbine manufacturer or a specialist company in the field.
The last O&M was carried out in 2010-2011 for a total amount of 47.3 million EUR. The following repairs were carried out:
- repair of the rotor with new blading
- repair of the stator flow section with new blading
- Replacement of quick-stop and control valve blocks
- repair of the control
- oil revision. system, repair of pumps
- revision of steam system, valves, drainage, replacement of steam hinges
The last repair (SO) was carried out in 2022-2023 for a total amount of 22 mil. The following repairs were carried out:
- inspection of the flow section of the turbine, cleaning, replacement of seals, balancing of the rotor
- oil revision and cleaning. system, revision of oil pumps, new radiator tubes
- revision and repair of the turbine control and the control safety system
- inspection of steam pipes and valves
Regular maintenance and servicing was carried out during operation.
Seller
Note: Register for free or log in, to access all information.
Registered since: 2025
Send inquiry
Telephone & Fax
+420 370 ... show
These listings may also fit your interest.
Listing

17,967 km
Steam turbine
1. Brněnská strojírnaTurbogenerator set 25MW
1. Brněnská strojírnaTurbogenerator set 25MW
Listing

17,967 km
Steam turbine
1. Brněnská strojírnaTurbogenerator set 25MW
1. Brněnská strojírnaTurbogenerator set 25MW
Your listing has been deleted successfully
An error has occurred